Power Plant 48MW, 440t/h for Sugar Plant.

Design bureau "Turbopar" made a Power Plant engineering design for the Sugar Plant.

The Power Plant is divided into 4 blocks:

  • Boiler Plant
  • Steam turbine Plant
  • Administrative block
  • Water Treatment Plant

Client: Sugar plant
Description: Construction of Power plant

Scope

of work:

performed design and working documentation

Electric power:

48MW

Steam capacity:

up to 440t / h

Main fuel:

natural gas, husk.

Location:

Russian Federation

 

The equipment supply is divided into two parts:

First stage:

  • 2 steam turbines(backpressure with extraction) 16 MW, 6.3 kV
  • 2 steam boilers 160 t / h each

Second stage:

  • 1 steam turbine(condensing turbine with industrial extraction) 16MW, voltage 6.3kV.
  • 4 steam boilers, each with steam output 30 t / h, 3.9 MPa, 440C