Biomass Boiler Plant, 4.2 MW

Design Engineering of a Biomass Boiler Plant, 4.2 MW, Local authority government


Client: City government

Description:

Biomass Boiler Plant, 4.2 MW heating power

Location: BY
Assignment:

Design Project of a new Biomass Boiler Plant.

Production: hot water

Area of operation:

Combined heating and power, electricity and automation process

Services:
  • General Design
  • PID, Heat balance diagrams, Steam flow diagrams
  • Piping and instrument diagrams
  • Pressure vessels and heat transfer equipment design
  • Specifications
  • Shop drawings and CAD drafting
  • Steel detailing
Used software:

Revit model, CAD drafting, 3D rendering, EPLAN model

Main equipment: boilers COMPTE.R (Komkont) 1.0 MW and 3.2 MW

Designer tasks

  • Placing boilers on existing foundations.
  • Seven days wood chips storage with an automated system for feeding.
  • Design an automated ash removal system.

Some designer’s decisions

In addition to boiler plant engineering, the designers also made design of the following facilities

  • Design solutions optimized the city heat network length 3000m.
  • Designers reduced the diameter of the pipes and made some optimization of the heating networks length.

Was installed: new pumps, chemical water treatment, and 11 individual heating units in order to provide the population with hot water supply.

Terms: 60days.