• info@turbopar.eu

  • +370 656 44 305

Automation control system for Power Plant 4 MWt

Type of construction: New construction
A number of signals: 2528

Automation equipment:

Siemens S7-300, ET200M, 24 cabinets

Main automation tasks:

CHP control including following equipment:

  • Two Steam Boilers 3.9MPa, 25t
  • Siemens Steam Turbine, 4 MW
  • Dual fuel burners
  • Electric power equipment and transformer
  • Instrumentations
  • Gas supply equipment
  • Reduction emergency cooling fittings

Design scope:

Control system design in an end-to-end design platform for electrical engineering, EPLAN instrumentation.

Programming:

Software development in an integrated software development environment for automation systems of technological processes from the level of drives and controllers to the level of the human-machine interface TIA Portal.

Terms of design:

4 months
Customer:

 

«Angren shakar», Sugar plant
Place: Angren, Uzbekistan

 

SEND ENQUIRY

To get commercial proposal send your enquiry please: