Type of construction: | New construction |
A number of signals: | 2528 |
Automation equipment: | Siemens S7-300, ET200M, 24 cabinets |
Main automation tasks: | CHP control including following equipment:
|
Design scope: | Control system design in an end-to-end design platform for electrical engineering, EPLAN instrumentation. |
Programming: | Software development in an integrated software development environment for automation systems of technological processes from the level of drives and controllers to the level of the human-machine interface TIA Portal. |
Terms of design: | 4 months |
Customer:
| «Angren shakar», Sugar plant |
Place: | Angren, Uzbekistan |
SEND ENQUIRY
To get commercial proposal send your enquiry please: